LINOS LLC
SAP · ERP · AI

Six engagements, described honestly and without the logos.

Our client agreements do not permit us to name companies, so these are anonymized. What they do carry is the actual situation we walked into and the work that followed, which is the part worth reading anyway.

A note on these. Every profile below is anonymized and carries no invented metrics. If you need named references with contactable sponsors for a proposal or a past-performance volume, ask and we will arrange them directly under NDA.

Six plants, six versions of the same process, one ERP instance.

A multi-plant building products manufacturer

SAP S/4HANAProduct CostingMulti-plant
The situation

Plant-level costing did not reconcile to the ledger, and each site had localized the template far enough that a change in one place broke reporting in another. Finance could not explain margin by product line without a manual rebuild.

What we did
  • Baselined the actual as-is process at each site rather than the documented one
  • Redesigned the controlling model and material ledger so plant costing tied to the ledger
  • Rebuilt the template with a governed local-variation process
  • Established a master data steward per domain before the next wave

A 2027 deadline, and nobody could size the custom code.

An industrial equipment group on SAP ECC

ECC to S/4HANAReadiness AssessmentCustom Code
The situation

Two decades of modifications, no current inventory, and a board asking for a conversion date. The honest answer was that no date was defensible until the custom-code and data picture existed.

What we did
  • Ran Pre-Check, ATC, and SCMON to produce a real custom-code inventory
  • Profiled the data estate and sized the remediation backlog
  • Modeled brownfield against selective transition on cost and downtime
  • Delivered a costed roadmap sequenced to the funding calendar

The racks were ordered before anyone modeled the throughput.

A distribution operator scaling into automation

SAP EWMWarehouse DesignAutomation
The situation

A new facility was mid-build with automation committed, and the warehouse process design had not been done. Storage strategy, wave logic, and labor flow were all still open questions with capital already spent.

What we did
  • Modeled throughput against the committed physical layout
  • Designed storage strategy, putaway, and wave logic to fit it
  • Implemented SAP EWM with RF and the automation interface
  • Built the labor model and key-user enablement before go-live

Serialization obligations that a validated environment made expensive to meet.

A specialty pharmaceutical manufacturer

DSCSASerializationGxP Validation
The situation

DSCSA saleable-returns verification was due, and every change to the validated landscape carried a documentation cost that made the obvious approach unaffordable.

What we did
  • Designed the EPCIS data flow and the serialization architecture
  • Built a risk-based validation approach to keep the qualification scope proportionate
  • Set up change control so routine changes avoided full revalidation
  • Produced the traceability matrix from requirement through test evidence

Program margin visible only at closeout, which is far too late.

A defense subcontractor under cost-reimbursable contracts

Project SystemDCAAIndirect Rates
The situation

Project cost accounting had been configured for financial reporting rather than contract reporting. Indirect rates were maintained in spreadsheets, and program managers had no in-flight view of where margin was going.

What we did
  • Reconfigured project accounting around the contract structure
  • Built the indirect rate structure with DCAA-ready documentation
  • Established in-flight margin reporting by program and work package
  • Designed the pricing approach for the next cost-plus bid

Recognize your situation in one of these?

Most of these engagements started with a client describing the symptom rather than the cause. That is a perfectly good place to start.